我正在寻找一种方法来确定两个日期之间的差异。
普通的 SQL DATEDIFF 语句不会削减它,因为我需要排除非工作时间和日期,即周末和 16:00 - 7:00 之间的任何时间。
类似于 excel 中的 NETWORKDAYS 函数。
我正在编写一个 Excel 电子表格。使用 VBA 连接到 SQL 服务器以提取数据。
最佳答案
这是我从网上下载并修改它以使用存储在访问表中的日期表的代码示例。我确定您可以再次将其更改为指向工作表中的某个范围等,但基本想法很有效
Option Compare Database
Option Explicit
Public Function dhCountWorkdaysA(ByVal dtmStart As Date, ByVal dtmEnd As Date, _
Optional adtmDates As Variant = Empty) _
As Integer
' Count the business days (not counting weekends/holidays) in
' a given date range.
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' Requires:
' SkipHolidays
' CountHolidays
' IsWeekend
' In:
' dtmStart:
' Date specifying the start of the range (inclusive)
' dtmEnd:
' Date specifying the end of the range (inclusive)
' (dates will be swapped if out of order)
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' Number of working days (not counting weekends and optionally, holidays)
' in the specified range.
' Example:
' Debug.Print dhCountWorkdaysA(#7/2/2000#, #7/5/2000#, _
' Array(#1/1/2000#, #7/4/2000#))
'
' returns 2, because 7/2/2000 is Sunday, 7/4/2000 is a holiday,
' leaving 7/3 and 7/5 as workdays.
Dim intDays As Integer
Dim dtmTemp As Date
Dim intSubtract As Integer
' Swap the dates if necessary.>
If dtmEnd < dtmStart Then
dtmTemp = dtmStart
dtmStart = dtmEnd
dtmEnd = dtmTemp
End If
' Get the start and end dates to be weekdays.
dtmStart = SkipHolidaysA(adtmDates, dtmStart, 1)
dtmEnd = SkipHolidaysA(adtmDates, dtmEnd, -1)
If dtmStart > dtmEnd Then
' Sorry, no Workdays to be had. Just return 0.
dhCountWorkdaysA = 0
Else
intDays = dtmEnd - dtmStart + 1
' Subtract off weekend days. Do this by figuring out how
' many calendar weeks there are between the dates, and
' multiplying the difference by two (because there are two
' weekend days for each week). That is, if the difference
' is 0, the two days are in the same week. If the
' difference is 1, then we have two weekend days.
intSubtract = (DateDiff("ww", dtmStart, dtmEnd) * 2)
' The answer to our quest is all the weekdays, minus any
' holidays found in the table.
intSubtract = intSubtract + _
CountHolidaysA(adtmDates, dtmStart, dtmEnd)
dhCountWorkdaysA = intDays - intSubtract
End If
End Function
Private Function CountHolidaysA( _
adtmDates As Variant, _
dtmStart As Date, dtmEnd As Date) As Long
' Count holidays between two end dates.
'
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' Required by:
' dhCountWorkdays
' Requires:
' IsWeekend
Dim lngItem As Long
Dim lngCount As Long
Dim blnFound As Long
Dim dtmTemp As Date
On Error GoTo HandleErr
lngCount = 0
Select Case VarType(adtmDates)
Case vbArray + vbDate, vbArray + vbVariant
' You got an array of variants, or of dates.
' Loop through, looking for non-weekend values
' between the two endpoints.
For lngItem = LBound(adtmDates) To UBound(adtmDates)
dtmTemp = adtmDates(lngItem)
If dtmTemp >= dtmStart And dtmTemp <= dtmEnd Then
If Not IsWeekend(dtmTemp) Then
lngCount = lngCount + 1
End If
End If
Next lngItem
Case vbDate
' You got one date. So see if it's a non-weekend
' date between the two endpoints.
If adtmDates >= dtmStart And adtmDates <= dtmEnd Then
If Not IsWeekend(adtmDates) Then
lngCount = 1
End If
End If
End Select
ExitHere:
CountHolidaysA = lngCount
Exit Function
HandleErr:
' No matter what the error, just
' return without complaining.
' The worst that could happen is that the code
' include a holiday as a real day, even if
' it's in the table.
Resume ExitHere
End Function
Public Function dhAddWorkDaysA(lngDays As Long, Optional dtmDate As Date = 0)
'Optional adtmDates As Variant) As Date
' Add the specified number of work days to the
' specified date.
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' In:
' lngDays:
' Number of work days to add to the start date.
' dtmDate:
' date on which to start looking.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value, if that's what you want.
' Out:
' Return Value:
' The date of the working day lngDays from the start, taking
' into account weekends and holidays.
' Example:
' dhAddWorkDaysA(10, #2/9/2000#, Array(#2/16/2000#, #2/17/2000#))
' returns #2/25/2000#, which is the date 10 work days
' after 2/9/2000, if you treat 2/16 and 2/17 as holidays
' (just made-up holidays, for example purposes only).
' Did the caller pass in a date? If not, use
' the current date.
Dim lngCount As Long
Dim dtmTemp As Date
Dim adtmDates() As Variant
'loadup the adtmDates with all the records from the table tblNon_working_days
Dim db As DAO.Database
Dim rst As DAO.Recordset
Dim i As Long
Set rst = DBEngine(0)(0).OpenRecordset("tblNon_working_days", dbOpenSnapshot)
With rst
If .RecordCount > 0 Then
i = 1
.MoveFirst
Do Until .EOF
ReDim Preserve adtmDates(i)
adtmDates(i) = !Date
.MoveNext
i = i + 1
Loop
End If
End With
rst.Close
db.Close
Set rst = Nothing
Set db = Nothing
If dtmDate = 0 Then
dtmDate = Date
End If
dtmTemp = dtmDate
For lngCount = 1 To lngDays
dtmTemp = dhNextWorkdayA(dtmTemp, adtmDates)
Next lngCount
dhAddWorkDaysA = dtmTemp
End Function
Public Function dhNextWorkdayA( _
Optional dtmDate As Date = 0, _
Optional adtmDates As Variant = Empty) As Date
' Return the next working day after the specified date.
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' Requires:
' SkipHolidays
' IsWeekend
' In:
' dtmDate:
' date on which to start looking.
' Use the current date, if none was specified.
' adtmDates (Optional):
' Array containing holiday dates. Can also be a single
' date value.
' Out:
' Return Value:
' The date of the next working day, taking
' into account weekends and holidays.
' Example:
' ' Find the next working date after 5/30/97
' dtmDate = dhNextWorkdayA(#5/23/1997#, #5/26/97#)
' ' dtmDate should be 5/27/97, because 5/26/97 is Memorial day.
' Did the caller pass in a date? If not, use
' the current date.
If dtmDate = 0 Then
dtmDate = Date
End If
dhNextWorkdayA = SkipHolidaysA(adtmDates, dtmDate + 1, 1)
End Function
Private Function SkipHolidaysA( _
adtmDates As Variant, _
dtmTemp As Date, intIncrement As Integer) As Date
' Skip weekend days, and holidays in the array referred to by adtmDates.
' Return dtmTemp + as many days as it takes to get to a day that's not
' a holiday or weekend.
' Modified from code in
' "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' Required by:
' dhFirstWorkdayInMonthA
' dbLastWorkdayInMonthA
' dhNextWorkdayA
' dhPreviousWorkdayA
' dhCountWorkdaysA
' Requires:
' IsWeekend
Dim strCriteria As String
Dim strFieldName As String
Dim lngItem As Long
Dim blnFound As Boolean
On Error GoTo HandleErrors
' Move up to the first Monday/last Friday, if the first/last
' of the month was a weekend date. Then skip holidays.
' Repeat this entire process until you get to a weekday.
' Unless adtmDates an item for every day in the year (!)
' this should finally converge on a weekday.
Do
Do While IsWeekend(dtmTemp)
dtmTemp = dtmTemp + intIncrement
Loop
Select Case VarType(adtmDates)
Case vbArray + vbDate, vbArray + vbVariant
Do
blnFound = FindItemInArray(dtmTemp, adtmDates)
If blnFound Then
dtmTemp = dtmTemp + intIncrement
End If
Loop Until Not blnFound
Case vbDate
If dtmTemp = adtmDates Then
dtmTemp = dtmTemp + intIncrement
End If
End Select
Loop Until Not IsWeekend(dtmTemp)
ExitHere:
SkipHolidaysA = dtmTemp
Exit Function
HandleErrors:
' No matter what the error, just
' return without complaining.
' The worst that could happen is that we
' include a holiday as a real day, even if
' it's in the array.
Resume ExitHere
End Function
Private Function IsWeekend(dtmTemp As Variant) As Boolean
' If your weekends aren't Saturday (day 7) and Sunday (day 1),
' change this routine to return True for whatever days
' you DO treat as weekend days.
' Modified from code in "Visual Basic Language Developer's Handbook"
' by Ken Getz and Mike Gilbert
' Copyright 2000; Sybex, Inc. All rights reserved.
' Required by:
' SkipHolidays
' dhFirstWorkdayInMonth
' dbLastWorkdayInMonth
' dhNextWorkday
' dhPreviousWorkday
' dhCountWorkdays
If VarType(dtmTemp) = vbDate Then
Select Case WeekDay(dtmTemp)
Case vbSaturday, vbSunday
IsWeekend = True
Case Else
IsWeekend = False
End Select
End If
End Function
Private Function FindItemInArray(varItemToFind As Variant, _
avarItemsToSearch As Variant) As Boolean
Dim lngItem As Long
On Error GoTo HandleErrors
For lngItem = LBound(avarItemsToSearch) To UBound(avarItemsToSearch)
If avarItemsToSearch(lngItem) = varItemToFind Then
FindItemInArray = True
GoTo ExitHere
End If
Next lngItem
ExitHere:
Exit Function
HandleErrors:
' Do nothing at all.
' Return False.
Resume ExitHere
End Function
关于sql - 日期差异,不包括某些时间和日期,我们在Stack Overflow上找到一个类似的问题: https://stackoverflow.com/questions/2590933/
我的数据库中有两张表,一张用于 field ,另一张用于预订。我需要的是一个查询来选择所有未预订的 field 。见下文: 餐 table 预订具有以下字段: bk_id venue_id 作为(预订
嗨,我是编码新手,我有一些培训项目,其中包括从 HTML 表单输入 MySQL 数据库。它就像你玩过的游戏的日志。第一个日期输入是您开始游戏的时间,第二个日期输入是您完成游戏的时间。但我需要检查器或类
我是这个 sql 编码的新手,我正在尝试学习新的东西。因此,我创建了一个交货表,其中包含一些属性,如商品代码、交货日期、交货数量。所以如何从同一张表中获取第一个交货日期(最小日期)和交货数量以及最晚交
我从支付网关返回了这个日期 2014-05-15T08:40:52+01:00 我得到 2014-05-15T08:40:52 但我无法识别时区 +01:00 的含义 我的位置时区是 UTC−06:0
我快要疯了,请帮忙。 我有一列包含日期时间值。 我需要找到每天的最小值和最大值。 数据看起来像这样 2012-11-23 05:49:26.000 2012-11-23 07:55:43.000
我从 json 数据中获取日期为 2015 年 4 月 15 日晚上 10:15我只想在 html 页面中显示 json 响应数据的时间,例如 10:15 PM这里我放了我的js函数和html代码 J
是否有 javascript 库或其他机制允许我将 .NET 日期/时间格式字符串(即 yyyy-MM-dd HH:mm:ss)传递给 javascript函数并让它相应地解析提供的日期时间值?我一直
我正在使用以下代码以正确的格式获取当前的 UTC 时间,但客户返回并要求时间戳现在使用 EST 而不是 UTC。我搜索了 Google 和 stackoverflow,但找不到适用于我现有代码的答案。
我有以下日期的平均温度数据。我想找到连续至少 5 天低于或高于 0 摄氏度的开始日期。 date_short mean.temp 1 2018-05-18 17.54 2 2018-05-19
它可以在其他网络浏览器中使用,但 IE11 返回无效日期。 为了调试我使用了下面的代码。 console.log('before - ' + date.value); date.value = new
我在 Excel 中有一个数据的 Web 提取,其中日期列带有/Date(1388624400000)/。我需要在 Excel 中将其转换为日期。 最佳答案 能够从 here 中推断出它. 假设字符串
嗨,我的 Schmema 有一个带有 ISO 日期的字段: ISODate("2015-04-30T14:47:46.501Z") Paypal 在成功付款后以该形式返回日期对象: Time/Date
我的 table : CREATE TABLE `tbdata` ( `ID` INT(10) NOT NULL AUTO_INCREMENT, `PatientID` INT(10) NOT
我正在 Ubuntu 服务器 12.04 中编写一个 shell 脚本,它应该比较日志文件中的一些数据。在日志文件中,日期以以下格式给出: [Mon Apr 08 15:02:54 2013] 如您所
我想使用 GROUP BY WITH ROLLUP 创建一个表并获取总行数而不是 null。 $sql ="SELECT IF(YEAR(transaktioner.datum
我正在创建博客文章,在成功迁移我的博客文件后,当我转到我网站的博客页面时返回一个错误(无法解析其余部分:':“Ymd”'来自'post.date|date: "Ymd"') 我似乎无法确定这是语法错误
我正在尝试获取要插入到 CAML 查询中的月份范围,即:2010-09-01 和 2010-09-30。 我使用以下代码生成这两个值: var month = "10/2010"; var month
如何将代码document.write("直到指定日期")更改为writeMessage(date)中的日期?此外,writeMessage(date) 中的日期未正确显示(仅显示年份)。感谢您帮助解
我在 Windows (XP) 和 Linux 上都尝试过 utime()。在 Windows 上我得到一个 EACCES 错误,在 Linux 上我没有得到任何错误(但时间没有改变)。我的 utim
我正在尝试计算发生在同一日期的值的总和(在 XYZmin 中)。 我的数据看起来像这样, bar <- structure(list(date = structure(c(15622, 15622,
我是一名优秀的程序员,十分优秀!