gpt4 book ai didi

java - 日期计算器 : Tell what day of the week a certain date is

转载 作者:行者123 更新时间:2023-11-30 06:41:49 26 4
gpt4 key购买 nike

我正在尝试用 Java 编写一个程序(这是一个学校作业,告诉你某个日期是星期几。(日期应该写在 yyyy-mm-dd 的形式上。)我想我用下面的代码想出了一个解决方案,但后来我发现了一个错误。

当您运行代码并在对话框中输入 1999-12-31 时,程序会告诉您输入的日期 (1999-12-31) 是星期五。但是当您输入日期 2000-01-01(即 1999-12-31 之后的一天)时,程序会告诉您这一天是星期日!星期六怎么了?当您输入 2000-02-29 和 2000-03-01 时会发生类似的问题,它们都将星期三作为答案!

我注意到,只有当您输入 2000-01-01 和 2000-02-29 之间的日期时才会出现此错误。如果有人能帮我找到错误的原因并解决问题,我将不胜感激!

import static javax.swing.JOptionPane.*;
import static java.lang.Math.*;

public class DateCalc {

// Here, between the DateCalc class declaration and the main method, several methods used in the program are
// constructed.

// The method isLeapYear tests whether the entered year is a leap year or not.
private static boolean isALeapYear(int year) {
// If the year is a multiple of 4 and not a multiple of 100, or a multiple of 400, then it is a leap year.
if ((year % 4 == 0 && year % 100 != 0) || year % 400 == 0) {
return true;
}
else {
return false;
}
}

// A method that tests whether a given string is written as a valid date.
private static boolean isAValidDate(int year, int month, int day) {
int maxValidYear = 9999;
int minValidYear = 1754;
if (year > maxValidYear || year < minValidYear) {
return false;
}
if (month < 1 || month > 12) {
return false;
}
if (day < 1 || day > 31) {
return false;
}
// Handle the February Month
if (month == 2) {
if (isALeapYear(year)) {
return (day <= 29); // This statement is true if the value of the day is less than or equal to 29 if the month is February within a leap year.
// Otherwise the statement is false and the method will return the boolean value false.
}
else {
return (day <= 28); // This statement is true if the value of the day is less than or equal to 28 if the month is February within a non-leap year.
// Otherwise the statement is false and the method will return the boolean value false.
}
}
// Month of April, June, September and November must have number of days less than or equal to 30.
if (month == 4 || month == 6 || month == 9 || month == 11) {
return (day <= 30);
}
return true;
}

// A method that calculates the day number within the year.
private static int dayNumberWithinYear(int year, int month, int day) {
// An array which stores the number of days in the different months (when the year is not a leap year).
// (Index 0 is the number of days in January, index 1 is the number of days in February, etc.)
int[] monthStructure = {31, 28, 31, 30, 31, 30, 31, 31, 30, 31, 30, 31};

// If the entered year is a leap year, then the monthStructure array will be initialized with an extra day in February, i.e the leap day.
if (isALeapYear(year)) {
monthStructure[1] = 29;
}

int sumDaysInPreviousMonths = 0;
int daysInTheCurrentMonth = day;
int dayNumber = 0;

// Loops through all the months (index 0 is January, index 1 is February, etc.).
for (int i = 0; i < month - 1; i++) {
sumDaysInPreviousMonths += monthStructure[i];
}

dayNumber = sumDaysInPreviousMonths + daysInTheCurrentMonth;

return dayNumber;
}

// A method that decides the day of the week of an entered date.
private static void weekDay(int year, int month, int day) {
// The number of days that have passed since January 1, 1754, excluding the days of the entered year and
// excluding the leap days.
int sumDaysInOrdinaryYears = (year - 1754) * 365;
int sumLeapDaysInLeapYears = 0;

// Suppose the entered year is n. The for-loop goes through all the years from year n-1 to year 1754, and
// checks if the current year in the loop is a leap year. The number of leap years between year 1754 and n-1
// is equal to the number of days that will get added (beside from the days in ordinary years) to the total
// days from January 1, 1754 to the entered date.
for (; year > 1754; year -= 1) {
if (isALeapYear(year)) {
sumLeapDaysInLeapYears += 1;
}
}
// The sum of all days from year 1754 to year n-1 (if the entered year is n), is equal to the sum of days in
// the ordinary years and the leap days in the years.
int sumDaysInEveryYearExcludingTheEntered = sumDaysInOrdinaryYears + sumLeapDaysInLeapYears;
int sumDaysInTotalYears = sumDaysInEveryYearExcludingTheEntered + dayNumberWithinYear(year, month, day);
int weekDay = sumDaysInTotalYears % 7;

if (weekDay == 0) {
showMessageDialog(null, "The date is a monday.");
}
else if (weekDay == 1) {
showMessageDialog(null, "The date is a tuesday.");
}
else if (weekDay == 2) {
showMessageDialog(null, "The date is a wednesday.");
}
else if (weekDay == 3) {
showMessageDialog(null, "The date is a thursday.");
}
else if (weekDay == 4) {
showMessageDialog(null, "The date is a friday.");
}
else if (weekDay == 5) {
showMessageDialog(null, "The date is a saturday.");
}
// If weekDay == 6
else {
showMessageDialog(null, "The date is a sunday.");
}
}

public static void main(String[] args) {
// This is step 3 in the laboratory instruction.
while (true) {
String date = showInputDialog("Please, enter a date on the form yyyy-mm-dd");

// If the user clicks 'Cancel' or clicks 'OK' when the dialog box is empty, the program will exit.
if (date == null || date.length() == 0) {
break;
}
int y = Integer.parseInt(date.substring(0,4));
int m = Integer.parseInt(date.substring(5,7));
int d = Integer.parseInt(date.substring(8));
if (!isAValidDate(y, m, d)) {
showMessageDialog(null, "Error! The entered date is invalid. " +
" Please enter a valid date on the form yyyy-mm-dd");
}
else {
weekDay(y, m, d);
}
}
}
}

最佳答案

与其要求我们调试您的整个代码,不如考虑 LocalDate得到想要的结果:

LocalDate ldt = LocalDate.parse("1999-12-31");
System.out.println(ldt.getDayOfWeek());
LocalDate ldt2 = LocalDate.parse("2000-01-01");
System.out.println(ldt2.getDayOfWeek());

输出:

FRIDAY

SATURDAY

关于java - 日期计算器 : Tell what day of the week a certain date is,我们在Stack Overflow上找到一个类似的问题: https://stackoverflow.com/questions/54633446/

26 4 0
Copyright 2021 - 2024 cfsdn All Rights Reserved 蜀ICP备2022000587号
广告合作:1813099741@qq.com 6ren.com